IN THE WORKS
With most of the cladding now in place rubbing down of the undercoat is started as work continues on fitting out the footplate
The shoulder cladding on the firebox has not yet been fitted but the boiler barrel is complete and being rubbed down
Some filling work is still necessary on minor blemishes as the engine is prepared to return initially in black livery for the Gloucester/Warwickshire 'Back to Black' Gala in May 2014 when 7820 will be joined by her stable mate 3850
Cladding being fitted to the saddle casting as all the 1.1/8" smoke box saddle bolts (36 in all) have
been fitted and secured
Final fitting of the boiler expansion brackets involves some minor modifications undertaken by Tyseley Locomotive Works staff to ensure a perfect fit after the extensive replacement of the fire box plating
The superheater header undergoes a hydraulic test before it can be re-instated in the smoke box