GETTING READY TO STEAM
The race is now on to complete 7820 so that it is available to the
Railway for the Cheltenham Gold Cup Event. Inside the smoke
box, new ejector and blower pipes are being fashioned and fitted.
The safety valve bonnet also requires some repairs and fitting to the
boiler cladding. The red nameplate is fitted on the fireman's side
whilst the drivers side will have a black background
Sunshine catches the new paintwork of 7820 as she stands
amongst the detritus inside Toddingtons covered accommodation.
No comments:
Post a Comment