INSURANCE STEAM TEST
On Friday, paired with a Hawksworth tender kindly loaned by the
7903 group, 7820 is prepared for her steam test
Steam up and blowing off
Final setting of the safety valves is undertaken during the steam test
Measurements for the spacer tubes on the safety valves
can now be taken, manufactured and fitted once the
steam test is complete
With the gauge at 225 p.s.i., 7820 passes her steam test with flying colours
On Saturday, 7820 stands in the sunshine in the company of 5542.
Running plating is being refitted whilst final setting of the
piston valves is undertaken
A new lubrication pipe is manufactured for fitting to the
regulator box inside the smoke box
Steam chest cladding, which should have been fitted prior
to the boiler being lifted in, has been modified to allow
it to be fitted after installation of the boiler
Steam pipe casing is cleaned ready for fitting
Steam pipe casing and seat hinges being prepared for fitting
Inside the shed, 4270 will join 7820 as part of the GW steam
fleet whilst work has started on 7903's 10 year overhaul
Plenty to do when 7820 is back in service as 2874, one of DML
Group's Churchward 2-8-0's, waits its turn in the restoration queue.
So if you are at a loose end for a few years,
you know where we are!!!!!!!!!!!!