22nd February 2014 - Toddington, GW Railway

 
GETTING READY TO STEAM
 
 
   The race is now on to complete 7820 so that it is available to the
  Railway for the Cheltenham Gold Cup Event. Inside the smoke
     box, new ejector and blower pipes are being fashioned and fitted.
 
 
       The safety valve bonnet also requires some repairs and fitting to the
       boiler cladding. The red nameplate is fitted on the fireman's side
whilst the drivers side will have a black background


                                  Sunshine catches the new paintwork of 7820 as she stands
                              amongst the detritus inside Toddingtons covered accommodation.