Monday 5 August 2013

Saturday 3rd & Sunday 4th August 2013

 

 

 
                                                                     Valve Gear
 

 

With the problems arising when the gear was dismantled from incorrectly marked components, the eccentric straps and rods have been erected to complete the assembly of the valve gear.

Connecting Rods

 
With the rod under the press, a start can be made to get the big end bush out
 
 
Spacers are arranged to push out the bush
 
 
Everything ready for the first press to break the seal on the bush
 
 
Hold tight - here we go!!!
 
 
The bush almost out
 

The bush brass is now ready to have the old white metal removed and then re-metalled, machined and
                                              fitted back into the rod - simples!

 
Rods, bushes and gudgeon pins which will shortly be performing the task they were designed for.
 
 
Smoke Box Components
 
 
Meanwhile in a galaxy far, far way a new petticoat spinning has been fashioned to fit the new blower ring casting
 
 
With the petticoat and blower ring assembled, it is ready for a trial fit to the later style of Manor chimney fitted after the redrafting of the mid 1950's which transformed the steaming capabilities of engines once renowned for being shy on steam.